James Wiley Craft Bridge, after flood
Photographic Material
- Identifier
- 000024453
- Alt Identifier
- cda.2022.01
- Asset Type
- Date
- Content created July 29, 2022
- Description (James Wiley Craft Bridge with piles of debris left by the currents of the July 2022 flood. The bridge was named in honor of Whitesburg's longtime mayor who passed away in 2021, the same year that a roof cover and railing were added as part of a city project.)
- James Wiley Craft Bridge with piles of debris left by the currents of the July 2022 flood. The bridge was named in honor of Whitesburg's longtime mayor who passed away in 2021, the same year that a roof cover and railing were added as part of a city project.
- Contributor
- Craft, James Wiley (subject)
- Format
- image/jpg
?map